Project characteristics and base cost

The form depicted in Figure 51 allows you enter the Project Characteristics for the desired future product. The range of technically feasible characteristics for each attribute is indicated above, for instance a Mean Time Between Failure between 24 to 96 months.

The meaning of Project Base Cost is explained in details in section III.8.C. You can ask the R&D department to seek the minimum base cost technically possible by checking the option Develop this project at the lowest possible base cost. Otherwise, check the option Develop this project at the base cost specified below and enter the desired cost for this project.

Note that the characteristics and base cost of continued projects cannot be changed.